Fire-rated glass partitions in City of London
From a single meeting room to a full fit-out, we design and install fire rated glass partitions in City of London. You get a surveyor on site, drawings to sign off and a written quote that does not change once agreed.
| System | Fire-rated glass partitions |
|---|---|
| Guide price | £700 to £1,250 per m², ex VAT |
| Lead time | Usually 5 to 8 weeks from survey |
| Postcode areas | EC postcodes and surrounding areas |
| Distance from our base | About 105 miles from Birmingham |
What is involved in fitting fire rated glass partitions in City of London?
Most City of London projects follow the same four stages: guide price, free survey, drawings with a fixed quote, then manufacture and installation. Large rooms and acoustic or fire-rated glass take longer to make, but time on site stays short.
Is fire-rated glass partitions right for your City of London office?
Tested glass and frame systems for corridors, escape routes and protected areas, 30 or 60 minutes. It is usually chosen for:
- Glazed stair and lobby enclosures
- Corridor and escape-route screens
- Walls between tenancies or fire compartments
What does it cost in City of London?
As an example, a single glass office front of 4.5 m at 2.7 m high in City of London is about 12.2 m² of glass, so roughly £8,500 to £15,200 ex VAT before doors and options. The price tool gives a range for your own sizes, and the free survey turns it into a fixed price.
Offices and buildings in City of London
London offices range from Cat A floors in new towers to listed buildings in the City and Westminster, and from converted warehouses in the East End to business parks on the outskirts. Access, loading bays and building management rules shape every installation as much as the glass does. Building age and ceiling type affect the fixing details more than the location itself.
Surveys are usually booked within a week of your enquiry.
Questions about fire rated glass partitions in City of London
Do I need landlord consent for glass partitions in City of London?
If you lease your office, almost certainly. We provide the drawings, product data and method statements most landlords in City of London ask for.
Can you survey my City of London office before I commit?
Yes. The survey is free and there is no obligation. We measure, check fixings and talk through options, then send drawings and a fixed quote.
How long does a glass partition project take in City of London?
Usually three to seven weeks from enquiry to handover, depending on the glass. Time on site in City of London is normally one to three days for a meeting room or office.
What is the difference between E and EI fire-rated glass?
E (integrity) glass stops flames and smoke for the rated time. EI glass also insulates, keeping the far side cool enough for people to pass safely. Escape routes often need EI.
Send us a floor plan and get a guide price today
Free survey, drawings to approve and a fixed written quote. Most rooms are fitted in one to three days.
